Opened 14 years ago

Last modified 13 years ago

#42 closed enhancement

Work flow for sharing task numbers — at Version 1

Reported by: Gavin Owned by:
Priority: major Milestone: 0.8 - Purchasing and Inventory Improvements
Component: gnuMims - application general Version: trunk
Keywords: Cc:

Description (last modified by Gavin)

With the concept of the maintenance technician entering the task and the production person entering the fault entry against that task there needs to be a clear work flow for sharing these task numbers.

One way to do this would be to reserve a number of tasks (say 5) for a technician and provide a report with the task numbers and space to write down the details. The technician could then print the report and hand the reserved numbers out to production as work comes up. Using the printed report to record the details in the space provided for later database entry into the appropriate task number. The production person would then have a task number to enter their fault entry against at any time they wish.

Another way to do this would be to make it very easy for the production person to list the "Unscheduled Breakins" for period and production reference. As these would be the only tasks to which this applies. They would then enter faults agains these tasks. The constraint on this would be that all tasks must be entered (with descriptions) before the production person came around to wanting to enter their fault entries produce their production report.

For production report see ticket #41.

Change History (1)

comment:1 Changed 14 years ago by Gavin

Description: modified (diff)
Note: See TracTickets for help on using tickets.